India Exchange Filings

Deccan Gold Bhalukona Project Exploration Update

Deccan Gold Mines Ltd reports preliminary modelling indicating potential for over 4 million tonnes of mineralisation at its Bhalukona project

  • Modelled grade is approximately 0.24% nickel equivalent at the Chhattisgarh nickel-copper-PGE project.
  • Interpretation is based on 15 drill holes totalling 2,773 metres and covers about 25% of the identified 1.3-km mineralised corridor.
  • The estimate is preliminary, is not a defined mineral resource or reserve, and requires further evaluation.

Original Filing

This is an automated summary of a public document. Always check the original before relying on it.