Indian Railways has achieved a breakthrough in the 6.59-km Tunnel-14 of the Rishikesh–Karnaprayag Rail Project in Uttarakhand. The milestone connects excavation drives from Sumerpur and Marora, advancing the project to improve connectivity to the state’s hill regions.
Breakthrough Achieved in 6.59 km Long Tunnel-14 of Rishikesh-Karnaprayag Rail Project
This is an automated summary of a public document. Always check the original before relying on it.
Filed under
Ministry of Railways (India)
