The Ministry of Coal’s ₹37,500-crore coal/lignite gasification scheme received two Round 2 applications from NTPC for urea and methanol/DME projects. Round 3 opened on November 10, with applications due by January 11, 2027.
Round 2 of ₹37,500 Crore Scheme for Promotion of Surface Coal/Lignite Gasification Projects Concludes with Two Applications from NTPC Limited; Round 3 Opens Today
This is an automated summary of a public document. Always check the original before relying on it.
Filed under
Ministry of Coal (India)
