Deccan Gold Mines Ltd reports preliminary modelling indicating potential for over 4 million tonnes of mineralisation at its Bhalukona project
- Modelled grade is approximately 0.24% nickel equivalent at the Chhattisgarh nickel-copper-PGE project.
- Interpretation is based on 15 drill holes totalling 2,773 metres and covers about 25% of the identified 1.3-km mineralised corridor.
- The estimate is preliminary, is not a defined mineral resource or reserve, and requires further evaluation.
