India Exchange Filings

Dilip Buildcon Order Receipt Highlights

Dilip Buildcon Ltd receives ₹688.23 crore NHAI award for a 9.66 km elevated corridor in Solapur

  • Project covers construction of a four-lane elevated corridor in Maharashtra under the Hybrid Annuity Mode.
  • Construction period: 24 months; operation period: 15 years from commercial operation.
  • Award value excludes GST.

Original Filing

This is an automated summary of a public document. Always check the original before relying on it.